This station building is basically a bridge structure given a form of a building. This entire work was already awarded to NBCC, a leading government construction company. However, to expedite the job and to get the railway into Navi Mumbai it was necessary to expedite the project and hence the job was awarded to us through re-tendering. Our scope of work included the pier and deck slab for 50% of the station building area including columns, beams and slab. The total concrete quantity of the project was 5000 cum.
The bigger slab was of the tune of 600 cum each and the smaller of 400 cum each. This entire pour of 600 cum was continuously concreted through manual means as the use of pump or ready mix concrete was not prominent at that time. More than 1000 labors were required in different shifts and the concreting process was more than 3 days at times. The work was completed in time and this structure was inaugurated by the President of India.
Project Brief:
Architect | : Firoz Khodianwala | |
Structural Consultant | : Dubon | |
Owner | : CIDCO for MTP Railways | |
Value of Work | : Rs.300 lacs in 1991 | |
Work Competition period | : 6 months | |
Concrete | : 6000 M3 | |
Reinf. Steel | : F.B.E.C. 1000 MT | |
Floor span | : 25 Meter | |
Floor beam | : 550 mm (W) x 2100 mm (D) | |
Form work & false work | : 24000 M2 (Steel modular) | |
Flooring dewatering, power float & power trowel | : Floor slab concrete finishing done by Tremix vaccum | |
Built up area | : 5000 sqft | |
renoWAH! is a technical facility management company specifically catering towards global brands.
Human Resource has been the till date been the key differentiators between Progressive & other companies and this is handled by the management directly... READ MORE
428,Vardhaman Market, Plot No. 75, Sector-17, Opp. Andhra Bank, Vashi, Navi Mumbai, Maharashtra. India. Pin - 400703.
Telefax : + 91- (022) 27882021 / 22
Email:- This email address is being protected from spambots. You need JavaScript enabled to view it.