Infrastructure

This is a  major bridge across the Shivna river in Dhule - Aurangabad- Solapur National highway near Kannad. The total length of the bridge is 98 mtr and width 12 meter of 14 meter span including both side footpath. The Bridge consist of open foundation, solid abutment, RCC pier and solid deck slab, Rcc wearing coat, Anti Crash barrier. The existing Low level bridge constructed by the british is along the same alignment which is now dismantled.

 

Project Brief:

Total length   : 98 mtrs
Concrete quantity   : 2850 cum
Shuttering quantity   : 6340 sqm
Reinforcement quantity   : 165 MT
Span   : 7 nos
Foundation   : Open
Time period   : 18 months
     
     
     

 

renoWAH!

renoWAH! is a technical facility management company specifically catering towards global brands.

Careers

Human Resource has been the till date been the key differentiators between Progressive & other companies and this is handled by the management directly... READ MORE

Contact Us

428,Vardhaman Market, Plot No. 75, Sector-17, Opp. Andhra Bank, Vashi, Navi Mumbai, Maharashtra. India. Pin - 400703.
Telefax : + 91- (022) 27882021 / 22 
Email:- This email address is being protected from spambots. You need JavaScript enabled to view it.

Установите себе обратный осмос