This bridge is about 200 mtr from the sea. The tidal variation at this location is in the range of 2.5 mtrs. As in other creek bridges, foundation was the most difficult part of the entire structure. The total length of the bridge is 60 mtr and 20 mt span x 3 nos.
Project Brief:
Total length | 60 mtrs | |
Concrete quantity | 2800 cum | |
Reinforcement quantity | 150 mt | |
Span | 20 mts | |
Foundation | Open | |
Tidal variation | 2.5 mtrs | |
Time period | 12 Months | |
{gallery}bridge-borli{/gallery}