To construct a bridge on river Godavari is a great achievement for any bridge contractor. This particular bridge was on sangam ie. confluence of 2 rivers. The stata seen at site was exposed basalt – however actually the basalt seen was an ofshoot of a river bed carried over duration of time. The sleek slabs are due to continuous slab arrangement.

Project Brief:

Total length        180 mtrs
Concrete quantity   8200 cum
Shuttering quantity   39,000 sqm
Reinforcement quantity   620 mt
Span   60 mt continious span
Foundation   Open at -6 mt GL
Time period   12 months