To construct a bridge on river Godavari is a great achievement for any bridge contractor. This particular bridge was on sangam ie. confluence of 2 rivers. The stata seen at site was exposed basalt – however actually the basalt seen was an ofshoot of a river bed carried over duration of time. The sleek slabs are due to continuous slab arrangement.
Project Brief:
Total length | 180 mtrs | |
Concrete quantity | 8200 cum | |
Shuttering quantity | 39,000 sqm | |
Reinforcement quantity | 620 mt | |
Span | 60 mt continious span | |
Foundation | Open at -6 mt GL | |
Time period | 12 months | |