This creek bridge is about 100 mtrs from the Arabian sea as a part of Costal Road project in Maharashtra. The total length of the bridge is 60 mtr made up of two spans of each 30 mtrs. The foundation was critical and was carried out by well sinking process. The sinking of the well had to be done to a depth of 30 mtr below the mean sea level.

Project Brief:

Total length      : 80 mtrs
Concrete quantity   : 5500 cum
Reinforcement quantity   : 500 mt
Span   : 30 mts box
Foundation   : Well foundation
Tidal variation   : 3.5 mtrs
Concrete   : M 25, M 30 site mix
Time period   : 12 Months