The work of the bridge proper was self designed. To enable economies the span was designed as continuous span bridges. Hence 15 mts support span had to be casted as 45 mtrs in one pour.
Project Brief:
Total length | : 135 mtrs | |
Concrete quantity | : 2800 cum | |
Shuttering quantity | : 12000 sqm | |
Reinforcement quantity | : 300 mt | |
Span | : 45 mt x 3nos | |
Foundation | : Open | |
Time period | : 8 months | |