The bridge span a major river Savitri in the Konkan area. The total length of the bridge is 300 mtr and the span is of concrete arches designed and then constructed by the company. The existing bridge constructed by the british is along the same alignment. The arches have enable good aesthetics. The company has been awarded the 1st prize by Indian Institute of Bridge engineers for this bridge at a National level.
Project Brief:
Total length | : 300 mtrs | |
Concrete quantity | : 8000 cum | |
Shuttering quantity | : 12000 sqm | |
Reinforcement quantity | : 325 mt | |
Span | : 9.0, 9.3 & 10.2 mtrs | |
Foundation | : Open | |
Time period | : 15 months | |