The bridge span a major river Savitri in the Konkan area. The total length of the bridge is 300 mtr and the span is of concrete arches designed and then constructed by the company. The existing bridge constructed by the british is along the same alignment. The arches have enable good aesthetics. The company has been awarded the 1st prize by Indian Institute of Bridge engineers for this bridge at a National level.
Project Brief:
Total length | : 300 mtrs | |
Concrete quantity | : 8000 cum | |
Shuttering quantity | : 12000 sqm | |
Reinforcement quantity | : 325 mt | |
Span | : 9.0, 9.3 & 10.2 mtrs | |
Foundation | : Open | |
Time period | : 15 months | |
renoWAH! is a technical facility management company specifically catering towards global brands.
Human Resource has been the till date been the key differentiators between Progressive & other companies and this is handled by the management directly... READ MORE
428,Vardhaman Market, Plot No. 75, Sector-17, Opp. Andhra Bank, Vashi, Navi Mumbai, Maharashtra. India. Pin - 400703.
Telefax : + 91- (022) 27882021 / 22
Email:- This email address is being protected from spambots. You need JavaScript enabled to view it.