This is a major bridge on a continuous flowing water on the river Patalganga in the Konkan area. The total length of the bridge is 98 mtr of 14mtr span with 300 meter length approaches. The span is of concrete girder designed and then constructed by the company. The existing bridge constructed by the british is along the same alignment.

 

Project Brief:

Total length   : 98 mtrs
Concrete quantity   : 2200 cum
Shuttering quantity   : 5200 sqm
Reinforcement quantity   : 115 MT
Span   : 7 nos
Foundation   : Open
Time period   : 18 months