This is a major bridge across Phulambri river on Aurangabad Jalgoan road in Marathwada area. The total length of the bridge is 77 mtr of 7 mtr span with 250 meter length approaches. The bridge consist of Raft foundation, solid abutment/pier and solid deck slab.
Project Brief:
Total length | : 77 mtrs | |
Concrete quantity | : 1850 cum | |
Shuttering quantity | : 5200 sqm | |
Reinforcement quantity | : 98 MT | |
Span | : 11 nos | |
Foundation | : Raft | |
Time period | : 18 months | |
{gallery}bridge-phulambry{/gallery}